Simplified estimate by max fajardo

broken image
broken image

We are a non-profit group that run this website to share documents. Please fill this form, we will try to respond as soon as possible.

broken image
broken image

That, concrete should be economically produced. Coarse Aggregate such as crushed stone, crushed gravel or natural gravel with particles retained on a 5 mm sieve. The contractor’s responsibility is only to provide a prcpert y mixed concrete containing the right proportions as pre cribed in the plan.Ĭoncrete Mixture,may be classified as either: Please help us to share our service with your friends. The Portland Pozzolan Cement with a low hardening characteristic concrete. Where the contractor is responsible in establishing the mixture proportion that will achieve the required strength and workability as specified in the plan. It can also constructionn prolonged exposure to high temperature of fxjardo than o 1, C. This Is referred to as workability of concrete. The Blast Furnace or Sulfate Cement used on concrete structures designed to resist chemical attack. DOWNLOAD SIMPLIFIED CONSTRUCTION ESTIMATES BY MAX FAJARDO simplified construction estimates by pdf. Oct 18, Download Category: Concrete, Construction Aggregate, Foot (Unit), Lime (Material), Cement. Wo, 14 nov GMT construction estimates by max fajardo pdf – construction estimate by Max Fajardo for philippines.

broken image